Modular ADU in California: Process, Permits and Build Options
GUIDE SERIES · PART 11 OF 48
Modular ADU in California: Process, Permits and Build Options
How a TOPK modular ADU fits California’s ADU rules, the approval routes and your site, from drawings to installation.
California’s ADU rules are among the most supportive in the United States, and a modular unit suits them well. A backyard ADU is a small building with a defined footprint, which is exactly what container-sized modules are good at. This guide explains the state framework, the approval routes for a factory-built module, which TOPK module types suit an ADU, and what you arrange locally. It is a general guide, so please confirm every point with your own city or county and a California-licensed professional.
What an ADU is
An accessory dwelling unit, or ADU, is a secondary home on a lot that already has a house. It can be detached, such as a backyard unit, or attached to the main house. A junior ADU, or JADU, is a smaller unit built within the existing house, and it has its own rules, including an owner-occupancy requirement. This guide is about detached and attached ADUs.

The state framework in brief
State ADU law sets rules that cities and counties must follow, even where a local ordinance is stricter or silent. The points below reflect the state’s current guidance, and local rules add detail on top.
- Ministerial approval. Qualifying ADU applications are checked against objective standards, without a public hearing or discretionary review.
- Timelines. The local agency checks an application for completeness within 15 business days, then approves or denies a complete application within 60 days. If it does neither, the application is deemed approved.
- A protected minimum size. State law allows at least an 800 square foot ADU with side and rear setbacks of four feet, even where local lot rules would otherwise stop it.
- Setbacks. Local agencies cannot require side and rear setbacks greater than four feet for new construction ADUs.
- Height and bedrooms. State law protects minimum height allowances, which depend on the lot and the unit’s position, and local agencies cannot limit the number of bedrooms.
- Fees. State law limits fees for smaller ADUs. Ask your agency what applies to your size.
The state publishes an ADU Handbook, updated in March 2026 for the changes effective January 1, 2026. Local rules vary, so start with your own city or county’s ADU page.
Two approval routes for a factory-built module
Compact 20ft Residential Module
A modular ADU can be approved in more than one way, and the route affects who inspects what and when.
| Feature | State-approved factory-built housing | Local building department review |
|---|---|---|
| Who approves the factory work | A third-party agency approved by the state housing department, with an insignia of approval on the unit | Your local building department reviews the plans, and inspects on site |
| What the local department does | Inspects the installation, foundation and connections | Reviews the plans and inspects the work as built |
| Suits | Units built in a programme approved by the state | Units permitted like other site-assembled buildings |
California’s factory-built housing law applies to residential units sold as factory-built housing in the state, and it is administered by the state housing department. Which route is right for a module built overseas is a question for your building department and your California engineer or architect, before you place an order. Tell TOPK which route your agency expects, and we will tell you what documents and inspections we can support.
Which TOPK module suits an ADU
TOPK builds two kinds of module, both made to your drawings.
| Feature | Container-size module | Non-standard size module |
|---|---|---|
| Dimensions | Same as a standard 20 ft or 40 ft container | Built to your drawings |
| Appearance | Similar to a shipping container | Designed to your brief |
| CSC plate | Yes | No |
| How it ships | As a container | Inside a container if it fits; flat-rack container or breakbulk vessel if it does not |
For planning, one 20 ft module has an outside footprint of about 160 sq ft, and one 40 ft module about 320 sq ft. As an illustration:
| Layout | Approximate footprint | Typical use |
|---|---|---|
| One 20 ft module | About 160 sq ft | Studio, office, guest room |
| One 40 ft module | About 320 sq ft | Studio or one-bedroom |
| Two 40 ft modules side by side | About 640 sq ft | One or two bedrooms, within the 800 sq ft state minimum |
Footprint is not the same as the interior area your agency measures, so confirm the size rules with your agency. Modules sized to fit inside a container, or matching a container, ship at container rates and give the best value for money.

Modules connect without welding
When an ADU uses more than one module, TOPK joins them with our own quick-connection system, without welding between the modules. The connection is designed to be waterproof, to keep the insulation continuous across the joint and to be quick to install. On a residential lot, that means a shorter installation and less disruption for the neighbours. Some interior and exterior trim at the joint line is still finished on site.
If you think you may need to relocate the unit later, tell us at the start. Under the right conditions, TOPK modules can be separated quickly and transported to a new site, and we can plan the foundations and connections with that in mind.
40ft Container Home Layout and Specifications
California requirements to plan for
- Seismic design. The structure and the connections to the foundation must suit your site’s seismic conditions. Your engineer provides the design loads, and TOPK builds to the approved drawings.
- Energy and building standards. California’s building and energy standards (Title 24) apply to new construction, and your engineer or energy consultant prepares the compliance documents.
- Fire safety. Sites in wildfire-prone areas have additional requirements for exterior materials and construction. Tell us if your lot is in such a zone.
- Foundation. The module sits on a foundation designed for California requirements and prepared by your local contractor.
- Utilities. Water, sewer, electrical and gas connections are made by your licensed trades and checked by your local inspector.
What TOPK supplies, and what you arrange locally
TOPK builds the module: the steel structure, insulation, and the wall, floor and roof system, with the openings and service routes set out in your drawings. Plumbing, wiring, windows, doors and appliances are chosen and fitted in California by your licensed trades, using products that carry the certification your agency accepts, such as UL-listed electrical components. This keeps the unit in line with California standards and lets your own electrician and plumber sign off their work.
You also arrange the permit set stamped by a California-licensed professional, the foundation, delivery from the port to your lot, the crane, the utility connections and the inspections. For a development of several ADUs, TOPK can supply fully finished buildings with certified components. Tell us your quantity.
The process, step by step
- Check your lot. Zoning, the local ADU ordinance, setbacks, easements and utility locations.
- Choose the module plan. One or more modules, sized for shipping.
- Send your sketch or drawings to TOPK. We prepare production drawings and confirm the module sizes.
- Prepare the permit set. Your California engineer or architect prepares the structural, energy and architectural documents your agency requires.
- Submit to your agency. The agency checks completeness, then approves or denies within the state timeline.
- Order and pay. Many owners place the order once the permit is issued, so that the drawings are final. Every TOPK building is made to order and cannot be sold to anyone else. Production starts only after the final drawings are approved and payment in full is received by T/T.
- Production and shipping. We send photos at the main stages. Modules ship to your California port, then by truck to your lot.
- Installation. The foundation is ready, the crane lifts the modules into place, and they are joined with the quick-connection system.
- Local fit-out and inspection. Your trades complete the services and finishes, and your agency inspects the unit.

Common mistakes
- Ordering before the approval route is clear. Confirm with your building department first.
- Sizing the unit without checking how your agency measures size. Footprint and interior area are not the same.
- Ignoring the site. Truck and crane access, slopes, trees and utility lines affect the installation and the budget.
- Leaving the local fit-out until the module arrives. Line up your trades and certified products in advance.
- Changing the design after production starts. Each unit is custom made, so changes after the final drawings are approved affect the schedule and cost.
FAQ
Can I build a modular ADU in California?
Yes. State law supports ADUs, and a factory-built module can be approved through your local building department, subject to the route your agency uses. Check with your city or county.
How long does the permit take?
State law requires the agency to check completeness within 15 business days and to approve or deny a complete application within 60 days. Preparing your documents takes time before that, so plan for it.
Is a container-size module allowed as an ADU?
It can be, if it meets your agency’s building standards and the approval route it requires. Ask your agency early, before you decide on the module type.
Do I need a California engineer or architect?
In most cases, yes, for the permit documents and the stamped plans. TOPK prepares the production drawings, and your California professional prepares the permit set.
Can the ADU be moved later?
In the right conditions, the modules can be separated quickly and transported. Tell us at the start if you may need to relocate the unit.
Do you ship the module to my lot?
We ship to your port, and you arrange delivery from the port to your lot. Tell us whether you prefer FOB, CIF or DAP terms.
Do I pay in advance?
Yes. Every TOPK building is custom made, so payment in full by T/T is received before production begins.